URETEK
call
URETEK crew drilling injection holes on a bridge deck, with the injection truck behind

Concrete Lifting & Leveling

A settled slab or pavement section doesn't stay a small problem. It disrupts traffic, equipment, and drainage.

Solutions for this Service

Foundation Settlementarrowactive arrow

Building Out of Levelarrowactive arrow

Added Load on Existing Foundationsarrowactive arrow

Pavement & Runway Settlementarrowactive arrow

Related Industries

Commercial and Institutionalarrowactive arrow

Municipal Infrastructurearrowactive arrow

Need a Site Assessment?

call icon

800-240-7868

Smiling woman in a yellow hard hat and suit jacket points up, holding blueprints.

A settled slab or pavement section doesn't stay a small problem. It disrupts traffic, equipment, and drainage. Concrete Lifting & Leveling is controlled lifting of settled slabs and pavement with elevation monitored throughout, while stabilizing the soil beneath so the slab isn't left on the same weak support. Facility owners, engineers, and public agencies use it on warehouse floors, loading docks, airport aprons, bridge approach slabs, and weigh-station slabs, without tearing them out and pouring new concrete.

Injection tubes set across a warehouse floor slab for a URETEK lift

Problems Concrete Lifting & Leveling Solves

A settled slab under traffic or equipment affects operations long before it fails. Here's what it turns into when it's left alone.

White checkmark symbol within a bright red circular background, indicating completion or success.

Bridge approach slabs and weigh-station slabs settling out of level against the adjacent pavement or structure

White checkmark symbol within a bright red circular background, indicating completion or success.

Facility floors settling under constant forklift, equipment, or foot traffic, creating uneven working conditions

White checkmark symbol within a bright red circular background, indicating completion or success.

Airport aprons, taxiways, and hangar floors developing faulted or misaligned panels that affect load transfer

White checkmark symbol within a bright red circular background, indicating completion or success.

Warehouse floors and loading docks settling out of level, disrupting forklift traffic and racking

Injection tubes set across a warehouse floor slab for a URETEK lift

Key Signs You Need Concrete Lifting & Leveling

Settled concrete usually shows itself in small ways above ground before it becomes a safety or compliance issue.

White checkmark symbol within a bright red circular background, indicating completion or success.

A visible lip or step where one slab section sits lower than the one next to it

White checkmark symbol within a bright red circular background, indicating completion or success.

Cracks radiating from one corner or edge of a slab

White checkmark symbol within a bright red circular background, indicating completion or success.

Water pooling on a slab or pavement surface after rain, instead of draining away

White checkmark symbol within a bright red circular background, indicating completion or success.

Doors, dock levelers, or equipment that no longer sit flush against a settled floor

White checkmark symbol within a bright red circular background, indicating completion or success.

Water ponding at slab edges or along settled joints

White checkmark symbol within a bright red circular background, indicating completion or success.

Faulted or misaligned joints on a parking lot, loading dock, or airport pavement

Concrete Lifting & Leveling keysigns

Benefits of Concrete Lifting & Leveling

Why facility owners, agencies, and engineers choose Concrete Lifting & Leveling over full slab replacement.

White checkmark symbol within a bright red circular background, indicating completion or success.

Restores the slab to grade and stabilizes what's holding it up. URETEK 486 Star polymer is injected beneath the settled area, densifying the soil while lifting the slab, so the fix addresses both the surface and the cause underneath it.

White checkmark symbol within a bright red circular background, indicating completion or success.

Restores a level surface without an open excavation. Because the work is trenchless, there's no exposed pit or trench for pedestrians, forklifts, or vehicles to navigate around during the repair.

White checkmark symbol within a bright red circular background, indicating completion or success.

The slab stays in place, so the surface stays usable during and after the work. No demolition and no new pour mean sidewalks, floors, and pavement don't need to be closed off and replaced, they're lifted where they already sit.

White checkmark symbol within a bright red circular background, indicating completion or success.

Most jobs finish in days, not the weeks a full replacement takes. On a Wyoming warehouse project, URETEK stabilized and leveled a 12,000-square-foot floor in three and a half days, and airport and municipal jobs in the case study library routinely close out in one to three days.

White checkmark symbol within a bright red circular background, indicating completion or success.

The polymer expands gradually to lift evenly, not with one sudden push. URETEK 486 Star expands once injected, applying controlled, even lifting pressure across the injection pattern rather than one abrupt jolt that could crack the slab further.

Why Choose Concrete Lifting & Leveling?

Concrete Lifting & Leveling is the right call when a slab, floor, or pavement surface has settled or become misaligned, and the concrete itself is still structurally sound enough to lift and reuse. It fits warehouse floors, loading docks, airport aprons, bridge approach slabs, and weigh-station slabs that have gone out of level.

It isn't the right tool when the slab itself is badly cracked or broken beyond what lifting can fix, since no amount of soil stabilization repairs concrete that's already failed structurally; that needs structural repair by others or replacement. It also isn't the starting point when there's no slab yet, new construction planned on weak soil needs Soil Stabilization before a slab is ever poured, not a leveling fix after the fact.

Concrete Lifting & Leveling is frequently the second half of a two-part project alongside Void Filling, when an underground void caused the slab to sink in the first place, filling the void and leveling the slab in the same mobilization avoids a second trip back to the site.

Our Approach

1

Evaluate

A URETEK project manager evaluates the site, the soils, and the failure mode, and designs the treatment around what the data shows.

2

Deploy

Crews mobilize on the schedule the site needs, including nights, weekends, or holidays, in a self-contained unit.

3

Drill

Small holes, as narrow as 5/8 inch, are drilled in a pattern designed around the slab's settlement.

4

Inject

URETEK 486 Star polymer is injected beneath the slab, densifying the soil as it expands and gradually raises the surface back to grade.

5

Monitor

Elevation is checked throughout the lift, so the slab comes back to grade evenly rather than overcorrecting in one spot.

6

Validate

We verify the result with a pre/post elevation survey (plus FWD testing for pavement and plate load testing for industrial slabs) and hand over the injection and test records.

Trusted by Engineers and Facility Owners Nationwide

URETEK has leveled warehouse floors, airport pavement, and university facilities nationwide, backed by decades of engineering and execution experience.

Logo for Los Angeles World Airports (LAWA) with blue 'LA' and black 'WA' text.Caltrans logo with intertwined blue and teal 'C' and 'T' letters above 'Caltrans' text.City of Springfield logo with a stylized blue and gray 'S' graphic.WVDOH Division of Highways logo featuring a West Virginia map and bridge.NTTA logo with "North Texas Tollway Authority" text in blue and green.Official seal of the City of Houston, Texas, featuring a gold train and star.

Frequently Asked Questions

Not if the reason it sank the first time gets fixed along with the slab. URETEK 486 Star polymer densifies the soil beneath the slab as it lifts it, so the slab is resting on stronger soil afterward, not the same weak soil that caused the problem. We verify the result with a pre/post elevation survey (plus FWD testing for pavement and plate load testing for industrial slabs). Designed for long-term performance when properly selected and installed. Public projects carry a two-year warranty against settlement. Private projects carry a one-year performance warranty plus a 10-year material warranty. Project terms govern.

Small holes, as narrow as 5/8 inch, are drilled in a pattern designed around the slab's settlement. URETEK 486 Star polymer is injected beneath it and expands gradually, applying gentle, even lifting pressure across the injection pattern rather than one sudden push in a single spot.

In most cases, yes, and often by a wide margin. On a faulted taxiway joint repair in Louisiana, URETEK's process saved the airport more than half the cost of replacing the pavement, while also backing the work with a two-year warranty against settlement.

Yes. On a Wyoming state warehouse project, URETEK stabilized and leveled a 12,000-square-foot floor in just three and a half days using the UDI process, without the extended shutdown a full floor replacement would have required.

Yes. At a landfill weigh station in New York, URETEK stabilized weak subsoils under all four slabs and raised the entrance slabs about 1.6 and 2.5 inches with joints returned to level, in two days without closing the station.

Bring settled slabs and pavement back to grade.

Get a settled slab or pavement section evaluated before it disrupts operations. URETEK crews respond fast, including emergencies.

Request an Assessment

URETEK

We Get to the Bottom of It. Engineering-led, trenchless ground improvement since 1989, with more than 10,000 projects worldwide. Questions about the soil beneath your infrastructure? Reach out today.

Request an Assessment

Phone
Address

13900 Humble Road, Tomball, TX 77375


Privacy PolicyTerms of ServiceSitemap
linkedin iconfacebook icon

© 2026 URETEK USA, Inc. All rights reserved.