URETEK Deep Injection® places structural polymer into targeted weak zones. It fills voids, compacts and confines the surrounding soil, and forms stabilized support zones that restore bearing performance and reduce future settlement.
Solutions for this Service
Sinkholes
Soil Loss & Erosion Voids
Weak Soils
Liquefaction Risk
Pavement & Runway Settlement
Loose Sands
Related Industries
Transportation
Industrial Facilities
Need a Site Assessment?
800-240-7868

URETEK Deep Injection® places structural polymer into targeted weak zones. It fills voids, compacts and confines the surrounding soil, and forms stabilized support zones that restore bearing performance and reduce future settlement. URETEK Deep Injection® (UDI) is a proprietary, high-density polyurethane injection process that densifies that soil and lifts what sits on top of it back toward its original position. Engineers, private owners, and public agencies use it on roads, runways, foundations, and structures that can't be closed for a full rebuild.

Weak, settled soil doesn't stay a small problem. Here's what it leads to if it's left alone.
Settled or uneven pavement that creates a safety hazard for drivers, aircraft, or pedestrians
Foundations or slabs that have dipped, cracked, or pulled away from adjoining structures
Soft, low-density soil that can't carry the load of a road, building, or piece of heavy equipment
Subsurface voids beneath pavement or structures that keep growing until the surface gives way

Weak soil usually shows itself on the surface before it becomes an emergency. Watch for these.
A dip, depression, or wave in pavement that wasn't there before
Cracks radiating outward from one point on a slab, foundation, or roadway
A structure or slab that has visibly tilted or settled unevenly
A hollow sound or spongy feel when the ground is walked or driven over
Water pooling in one spot after rain, even on ground that should drain evenly
Joints or panels that no longer line up the way they did when built

Why engineers and agencies choose UDI over excavation or full reconstruction.
Handles jobs from a single settled panel to a full runway. URETEK has used UDI to complete more than 10,000 projects worldwide since 1989, on everything from commercial slabs to interstate highways and international airports.
Lowers the safety risk that comes with open excavation. Because holes are as small as 5/8 inch, crews aren't working inside a trench next to live traffic or unstable soil, which is the main safety hazard with dig-and-replace repair.
Keeps the road, runway, or facility open. At LAX, crews stabilized and lifted the Terminal 6 area and a section of runway 24R/6L in one night, 10 p.m. to 6 a.m., and air traffic resumed on schedule.
Works nights, weekends, or holidays, and cures fast. URETEK 486 Star® reaches about 90% of its strength within 15 minutes of injection. Crews can mobilize on short notice and finish before the next operating shift begins.
Holds its strength even in wet or flowing groundwater. URETEK 486 Star® is hydro-insensitive and expands once injected, densifying soil that ordinary grout would wash out of before it could cure.
URETEK Deep Injection® (UDI) is the right call when settled pavement, a dipping foundation, or a sinking structure needs to be lifted back toward grade, or when soil beneath a load simply needs more density and bearing capacity. It's URETEK's flagship, proprietary process and the one used across the widest range of projects, from highway panels to airport runways to building foundations.
It's not the right tool when the main goal is a water barrier rather than lifting or densifying soil; Curtain Grouting is built for that. It also isn't the first choice when the primary problem is a large, already-formed underground void with little load above it; Void Filling addresses that more directly. For clean sands and gravels where the goal is to bind the grains and cut permeability rather than fill voids and compact the soil, Permeation Grouting is the closer fit.
URETEK Deep Injection® (UDI) is frequently paired with Concrete Lifting & Leveling on the same project, since lifting a settled slab back to grade and densifying the soil beneath it are often part of the same repair.
1
Evaluate
A URETEK project manager evaluates the site, the soils, and the failure mode, and designs the treatment around what the data shows. Soil conditions, structural loads, and project goals are assessed to define the right treatment.
2
Deploy
Crews mobilize on the schedule your site needs, including nights, weekends, and holidays, arriving in a self-contained unit ready to work.
3
Drill
Precise injection points are drilled in a pattern built around your soil testing results, using holes as small as 5/8 inch.
4
Inject
URETEK 486 Star® is injected and expands to fill voids and compact the surrounding soil. URETEK 486 Star® reaches about 90% of its strength within 15 minutes of injection. Injection pressure, volume, and surface elevation are monitored in real time.
5
Restore
Access holes are patched and the site is cleared, with no trench to backfill. The work area is back in use with minimal disruption.
6
Validate
Results are verified with the test that fits the asset: FWD for jointed pavement, DCP for roadway and airport weak zones, plate load testing for slabs, elevation survey for tanks and foundations, GPR or coring for voids.
Working on asphalt that will be milled? See the Countersinking Injection System.
Rapid Repair. Many repairs are back in service the same shift.
Long-Lasting Results. Public projects carry a two-year warranty against settlement. Private projects carry a one-year performance warranty plus a 10-year material warranty. Project terms govern.
Hydro Insensitive. URETEK 486 Star® holds its strength even when injected directly into flowing water, unlike materials that wash out or dilute.
Cost Saving. Shorter closures, little or no excavation where conditions permit, and less hauling and cure time can lower the total cost of the repair compared with remove-and-replace.
History of Success. URETEK has completed more than 10,000 projects worldwide since 1989 and was first to bring polymer injection ground improvement to the U.S.
Environmental Profile. UDI can reduce demolition and material movement compared with remove-and-replace. The current SDS and TDS for URETEK 486 Star® are available on request.
URETEK has delivered more than 10,000 projects worldwide since 1989, from commercial slabs to interstate highways and international airports.
We verify the result with the test that fits the asset (DCP, FWD, plate load, elevation survey, GPR or coring). URETEK 486 Star® reaches about 90% of its strength within 15 minutes of injection. Designed for long-term performance when properly selected and installed. Public projects carry a two-year warranty against settlement. Private projects carry a one-year performance warranty plus a 10-year material warranty. Project terms govern.
Yes. URETEK 486 Star® is hydro-insensitive, meaning it holds its strength even when injected directly into flowing water, which is not true of every injection material. That matters for sites with a high water table or an active leak feeding the settlement in the first place.
In most cases, yes. On the I-95 project in Cranston, Rhode Island, URETEK completed the repair in 10 days, five days ahead of schedule, at a cost $125,000 under budget, mainly because there was no excavation, no trench restoration, and no extended lane closures to pay for.
Yes. At LAX, crews stabilized and lifted the Terminal 6 area and a section of runway 24R/6L in one night, 10 p.m. to 6 a.m., and air traffic resumed on schedule. Crews regularly work nights, weekends, and holidays specifically to avoid closing roads, runways, or facilities during normal operating hours.
UDI is used to lift and stabilize highways and runways, but also building foundations, bridge approaches, tank pads, and other structures wherever weak or settled soil is the underlying cause. The injection depth and pattern are designed around the specific structure and load, not a one-size layout.
Get the soil beneath your road, foundation, or structure evaluated before a small dip becomes a bigger repair. URETEK crews respond fast, including emergencies.