URETEK Deep Injection® places structural polymer into targeted weak zones. It fills voids, compacts and confines the surrounding soil, and forms stabilized support zones that restore bearing performance and reduce future settlement.

Solutions for this Service

Sinkholesarrowactive arrow

Soil Loss & Erosion Voidsarrowactive arrow

Weak Soilsarrowactive arrow

Liquefaction Riskarrowactive arrow

Pavement & Runway Settlementarrowactive arrow

Loose Sandsarrowactive arrow

Related Industries

Transportationarrowactive arrow

Industrial Facilitiesarrowactive arrow

Need a Site Assessment?

call icon

800-240-7868

Smiling woman in a yellow hard hat and suit jacket points up, holding blueprints.

URETEK Deep Injection® places structural polymer into targeted weak zones. It fills voids, compacts and confines the surrounding soil, and forms stabilized support zones that restore bearing performance and reduce future settlement. URETEK Deep Injection® (UDI) is a proprietary, high-density polyurethane injection process that densifies that soil and lifts what sits on top of it back toward its original position. Engineers, private owners, and public agencies use it on roads, runways, foundations, and structures that can't be closed for a full rebuild.

URETEK Deep Injection® (UDI) feature

Problems URETEK Deep Injection® (UDI) Solves

Weak, settled soil doesn't stay a small problem. Here's what it leads to if it's left alone.

White checkmark symbol within a bright red circular background, indicating completion or success.

Settled or uneven pavement that creates a safety hazard for drivers, aircraft, or pedestrians

White checkmark symbol within a bright red circular background, indicating completion or success.

Foundations or slabs that have dipped, cracked, or pulled away from adjoining structures

White checkmark symbol within a bright red circular background, indicating completion or success.

Soft, low-density soil that can't carry the load of a road, building, or piece of heavy equipment

White checkmark symbol within a bright red circular background, indicating completion or success.

Subsurface voids beneath pavement or structures that keep growing until the surface gives way

URETEK Deep Injection® (UDI) feature

Key Signs You Need URETEK Deep Injection® (UDI)

Weak soil usually shows itself on the surface before it becomes an emergency. Watch for these.

White checkmark symbol within a bright red circular background, indicating completion or success.

A dip, depression, or wave in pavement that wasn't there before

White checkmark symbol within a bright red circular background, indicating completion or success.

Cracks radiating outward from one point on a slab, foundation, or roadway

White checkmark symbol within a bright red circular background, indicating completion or success.

A structure or slab that has visibly tilted or settled unevenly

White checkmark symbol within a bright red circular background, indicating completion or success.

A hollow sound or spongy feel when the ground is walked or driven over

White checkmark symbol within a bright red circular background, indicating completion or success.

Water pooling in one spot after rain, even on ground that should drain evenly

White checkmark symbol within a bright red circular background, indicating completion or success.

Joints or panels that no longer line up the way they did when built

URETEK Deep Injection® (UDI) keysigns

Benefits of URETEK Deep Injection® (UDI)

Why engineers and agencies choose UDI over excavation or full reconstruction.

White checkmark symbol within a bright red circular background, indicating completion or success.

Handles jobs from a single settled panel to a full runway. URETEK has used UDI to complete more than 10,000 projects worldwide since 1989, on everything from commercial slabs to interstate highways and international airports.

White checkmark symbol within a bright red circular background, indicating completion or success.

Lowers the safety risk that comes with open excavation. Because holes are as small as 5/8 inch, crews aren't working inside a trench next to live traffic or unstable soil, which is the main safety hazard with dig-and-replace repair.

White checkmark symbol within a bright red circular background, indicating completion or success.

Keeps the road, runway, or facility open. At LAX, crews stabilized and lifted the Terminal 6 area and a section of runway 24R/6L in one night, 10 p.m. to 6 a.m., and air traffic resumed on schedule.

White checkmark symbol within a bright red circular background, indicating completion or success.

Works nights, weekends, or holidays, and cures fast. URETEK 486 Star® reaches about 90% of its strength within 15 minutes of injection. Crews can mobilize on short notice and finish before the next operating shift begins.

White checkmark symbol within a bright red circular background, indicating completion or success.

Holds its strength even in wet or flowing groundwater. URETEK 486 Star® is hydro-insensitive and expands once injected, densifying soil that ordinary grout would wash out of before it could cure.

Why Choose URETEK Deep Injection® (UDI)?

URETEK Deep Injection® (UDI) is the right call when settled pavement, a dipping foundation, or a sinking structure needs to be lifted back toward grade, or when soil beneath a load simply needs more density and bearing capacity. It's URETEK's flagship, proprietary process and the one used across the widest range of projects, from highway panels to airport runways to building foundations.

It's not the right tool when the main goal is a water barrier rather than lifting or densifying soil; Curtain Grouting is built for that. It also isn't the first choice when the primary problem is a large, already-formed underground void with little load above it; Void Filling addresses that more directly. For clean sands and gravels where the goal is to bind the grains and cut permeability rather than fill voids and compact the soil, Permeation Grouting is the closer fit.

URETEK Deep Injection® (UDI) is frequently paired with Concrete Lifting & Leveling on the same project, since lifting a settled slab back to grade and densifying the soil beneath it are often part of the same repair.

Our Approach

1

Evaluate

A URETEK project manager evaluates the site, the soils, and the failure mode, and designs the treatment around what the data shows. Soil conditions, structural loads, and project goals are assessed to define the right treatment.

2

Deploy

Crews mobilize on the schedule your site needs, including nights, weekends, and holidays, arriving in a self-contained unit ready to work.

3

Drill

Precise injection points are drilled in a pattern built around your soil testing results, using holes as small as 5/8 inch.

4

Inject

URETEK 486 Star® is injected and expands to fill voids and compact the surrounding soil. URETEK 486 Star® reaches about 90% of its strength within 15 minutes of injection. Injection pressure, volume, and surface elevation are monitored in real time.

5

Restore

Access holes are patched and the site is cleared, with no trench to backfill. The work area is back in use with minimal disruption.

6

Validate

Results are verified with the test that fits the asset: FWD for jointed pavement, DCP for roadway and airport weak zones, plate load testing for slabs, elevation survey for tanks and foundations, GPR or coring for voids.

Working on asphalt that will be milled? See the Countersinking Injection System.

What Makes UDI Different?

White checkmark symbol within a bright red circular background, indicating completion or success.

Rapid Repair. Many repairs are back in service the same shift.

White checkmark symbol within a bright red circular background, indicating completion or success.

Long-Lasting Results. Public projects carry a two-year warranty against settlement. Private projects carry a one-year performance warranty plus a 10-year material warranty. Project terms govern.

White checkmark symbol within a bright red circular background, indicating completion or success.

Hydro Insensitive. URETEK 486 Star® holds its strength even when injected directly into flowing water, unlike materials that wash out or dilute.

White checkmark symbol within a bright red circular background, indicating completion or success.

Cost Saving. Shorter closures, little or no excavation where conditions permit, and less hauling and cure time can lower the total cost of the repair compared with remove-and-replace.

White checkmark symbol within a bright red circular background, indicating completion or success.

History of Success. URETEK has completed more than 10,000 projects worldwide since 1989 and was first to bring polymer injection ground improvement to the U.S.

White checkmark symbol within a bright red circular background, indicating completion or success.

Environmental Profile. UDI can reduce demolition and material movement compared with remove-and-replace. The current SDS and TDS for URETEK 486 Star® are available on request.

Trusted by Airports and Transportation Agencies Nationwide

URETEK has delivered more than 10,000 projects worldwide since 1989, from commercial slabs to interstate highways and international airports.

Logo for Los Angeles World Airports (LAWA) with blue 'LA' and black 'WA' text.Caltrans logo with intertwined blue and teal 'C' and 'T' letters above 'Caltrans' text.City of Springfield logo with a stylized blue and gray 'S' graphic.WVDOH Division of Highways logo featuring a West Virginia map and bridge.NTTA logo with "North Texas Tollway Authority" text in blue and green.Official seal of the City of Houston, Texas, featuring a gold train and star.

Frequently Asked Questions

We verify the result with the test that fits the asset (DCP, FWD, plate load, elevation survey, GPR or coring). URETEK 486 Star® reaches about 90% of its strength within 15 minutes of injection. Designed for long-term performance when properly selected and installed. Public projects carry a two-year warranty against settlement. Private projects carry a one-year performance warranty plus a 10-year material warranty. Project terms govern.

Yes. URETEK 486 Star® is hydro-insensitive, meaning it holds its strength even when injected directly into flowing water, which is not true of every injection material. That matters for sites with a high water table or an active leak feeding the settlement in the first place.

In most cases, yes. On the I-95 project in Cranston, Rhode Island, URETEK completed the repair in 10 days, five days ahead of schedule, at a cost $125,000 under budget, mainly because there was no excavation, no trench restoration, and no extended lane closures to pay for.

Yes. At LAX, crews stabilized and lifted the Terminal 6 area and a section of runway 24R/6L in one night, 10 p.m. to 6 a.m., and air traffic resumed on schedule. Crews regularly work nights, weekends, and holidays specifically to avoid closing roads, runways, or facilities during normal operating hours.

UDI is used to lift and stabilize highways and runways, but also building foundations, bridge approaches, tank pads, and other structures wherever weak or settled soil is the underlying cause. The injection depth and pattern are designed around the specific structure and load, not a one-size layout.

Don't let settlement get worse.

Get the soil beneath your road, foundation, or structure evaluated before a small dip becomes a bigger repair. URETEK crews respond fast, including emergencies.

Request an Assessment

URETEK

We Get to the Bottom of It. Engineering-led, trenchless ground improvement since 1989, with more than 10,000 projects worldwide. Questions about the soil beneath your infrastructure? Reach out today.

Request an Assessment

Phone
Address

13900 Humble Road, Tomball, TX 77375


Privacy PolicyTerms of ServiceSitemap
linkedin iconfacebook icon

© 2026 URETEK USA, Inc. All rights reserved.