URETEK
call

URETEK Provides Lasting Solution for Inflow & Infiltration Challenges

Written By Admin

Published on 8/12/2026

cover image

Table Of Content

  • Introduction
  • Repairs Delayed and Problems Compounded
  • A New Approach to I&I in Indiana
  • URETEK 486 Star® Polymer

Introduction

With winter moving on and warmer weather approaching, state and local government officials anticipate the arrival of seasonal rains that can present serious challenges during the spring and early summer. In some areas, inflow & infiltration (I&I) issues following heavy rain events cause pump stations to experience a significant increase in flow, and wastewater treatment plants are pushed to their limits to keep up. Additional costs are passed along to taxpayers, and local governments with an eye on future development find that I&I seriously impacts their ability to follow through on promises of growth.

For cities trying to grow and expand their tax base, seasonal I&I issues can seriously limit their options and threaten their ability to sign future capacity letters for new commercial developments.

Repairs Delayed and Problems Compounded

Typical budget constraints force local governments to delay repairs on cracked and leaking manholes and wastewater pipelines, and this delay can compound one rainy year's challenges and force local officials to face even more costly repairs in subsequent years.

In the past, dealing with I&I issues involved major construction projects with expensive timelines, heavy equipment, extensive excavation, traffic disruption, and the temporary interruption of services.

A New Approach to I&I in Indiana

In cities across the country, the concept of system "rehabilitation" has been shown to offer significant cost and time savings over traditional replacement of cracked and broken underground infrastructure assets. Leading the way with this improved approach is URETEK and its URETEK Deep Injection® (UDI) application.

A recent project illustrates this point clearly. For the city of Clarksville, Indiana, high-rain events brought a 500% increase in pump station flow and an overall 300% increase at the wastewater treatment plant. With future commercial development hanging in the balance, city leaders needed to get to the bottom of whatever was going on with their wastewater treatment system.

CCTV analysis revealed that the suspected I&I issues were, indeed, the cause of the problems. The city evaluated all the options available to them and decided to go with URETEK because it was faster, less invasive, and less expensive.

Seven manholes were treated with UDI in about 1.5 days.

URETEK 486 Star® Polymer

URETEK 486 Star® polymer is a two-component, high-density, expanding thermoset polyurethane system that reaches about 90% of its strength within 15 minutes of injection and seals cracked and leaking underground pipes and manholes.

URETEK developed its polymer to be the ideal solution for under-sealing, void filling, lifting of settled pavement, stabilization and stiffening of weak soils, and encapsulating and sealing buried infrastructure. URETEK 486 Star® is hydro-insensitive, which matters in cases of I&I: it keeps its compressive strength even when injected into flowing water. The current SDS and TDS for URETEK 486 Star® are available on request.

Trusted Vendor for Local Governments and Prime Contractors

For over 30 years, professionals have turned to URETEK for rapid, lasting solutions that align with tight budgets and keep our nation's infrastructure assets on the job.

URETEK's long history of successful UDI application has established the company as a trusted UDI contractor that can instantly mobilize to job sites across the country. When we arrive, our crews get right to work on a site-specific infrastructure repair or maintenance solution that quickly mitigates inflow & infiltration issues and extends the reliable working life of manholes, water and wastewater systems, and underground utilities. With little or no excavation where conditions permit, many projects are completed in days rather than weeks or months.

I&I Repair Wherever You Are

Across the United States, folks are occasionally reminded about the effects of too much water on critical infrastructure. Manholes in your area can leak under pressure, just as they did in Clarksville. And just like it did in Indiana, UDI will quickly and affordably stop I&I from overwhelming your city's water treatment facilities.

Contact URETEK today to learn more about our speedy I&I repair and maintenance solutions that keep budgets in line while ensuring many more years of reliable service from manholes and other underground infrastructure assets.

FAQs

High-rain events brought a 500% increase in pump station flow and an overall 300% increase at the city's wastewater treatment plant, from inflow and infiltration through its manholes.

Seven manholes were treated with UDI, and the entire repair was completed in less than two days.

It is hydro-insensitive, keeping its compressive strength even when injected into flowing water, and it reaches about 90% of its strength within 15 minutes of injection, sealing cracked and leaking pipes and manholes.

From Unstable Ground To Verified Results

See how URETEK stops inflow and infiltration from overwhelming your city's water treatment facilities.

Contact URETEK

URETEK

We Get to the Bottom of It. Engineering-led, trenchless ground improvement since 1989, with more than 10,000 projects worldwide. Questions about the soil beneath your infrastructure? Reach out today.

Request an Assessment

Phone
Address

13900 Humble Road, Tomball, TX 77375


Privacy PolicyTerms of ServiceSitemap
linkedin iconfacebook icon

© 2026 URETEK USA, Inc. All rights reserved.