Corporate Info
What We Do
How We Do It
Who We Serve
Resources
Case Studies
Contact



URETEK USA is committed to extending the life of your highways, roads, bridge approach and departure ramps and underground infrastructure assets with non-invasive, cost effective pavement lifting and soil stabilization solutions. URETEK USA repairs unstable soil, both immediately below and at depth, beneath pavement surfaces and restores them to their original profile - all with only minimal disruption of traffic flow and daily business activities. Competitive offerings use very disruptive repair methods that can interfere with traffic flow and commercial operations for days or weeks - a totally unacceptable proposition in today's non-stop business environment.

URETEK USA Advantages:

  • The Uretek Method™ fills voids immediately beneath highways, roads, bridge approach/departure ramps, and taxiways/ runways in a precise, fast and non-invasive manner.
  • The patented URETEK Deep Injection Method™ method is used when base soils fail and/or underground infrastructure is involved - even as deep as 30 feet and beyond. Application of this method stabilizes the soil beneath the pavement surface preventing future problems!
  • URETEK486, our patented polymer material used to fill voids, is hydro-insensitive and environmentally neutral.
  • URETEK486 is a rapid curing material that allows pavement surfaces to be used within 15 minutes of a project's completion.
  • With 50,000 completed projects worldwide URETEK has the expertise to put you in control of your soil stabilization and concrete lifting problems.
  • Projects completed with over 40 State DOT's nationwide - And ongoing, annual contracts with over 15 DOT's
Resources:
 
URETEK USA Delivers:
 
Time Savings:
90% faster than competitive solutions
Project work completed in hours/days versus weeks/months
Fast installation, curing and cleanup

Minimal Disruption:
Minimizes or eliminates work zone delays
Work often done during off peak night time hours
Crews dismantle and remove work zones as they finish daily

Cost Savings:
Up to 75% less than replacement cost
10 Year material guarantee

Predictable Results:
75,000 successful projects worldwide
Precision adjustment to 1/8"
Hydro- insensitive - displaces under pavement water

Safety
Clean, organized worksite
Professionally trained & certified employees
Environmentally safe, inert product