Corporate Info
What We Do
How We Do It
Who We Serve
Resources
Case Studies
Contact



URETEK USA is committed to extending the life of your ramp, apron, taxiway and runway assets with non-invasive, cost effective soil stabilization and panel lifting solutions. URETEK USA's URETEK Method™ repairs unstable soil immediately below ramps, aprons, taxiways and runways. Where applicable, this approach is combined with URETEK Stitch-In-Time™ technology and pre-cast panel replacement program for rapid repair of ramps, aprons, taxiways and runways - all with minimal disruption to traffic flow, functional operation and daily business activities. Competitive offerings use very disruptive repair methods that can interfere with traffic flow and and/or commercial operations for days, weeks or even months - a totally unacceptable proposition in today's non-stop business environment.

URETEK USA Advantages:

  • The Uretek Method™ used to fill voids immediately beneath taxiways, runways and other airport properties is precise, fast and non-invasive.
  • The patented URETEK Deep Injection Method™ is used when base and/or surrounding soils fail and/or underground infrastructure is involved - even as deep as 30 feet and beyond. This method stabilizes the soil under taxiway and runway slabs, preventing future problems!
  • URETEK486, our patented expanding polymer material used to fill voids, is hydroinsensative and environmentally neutral.
  • URETEK486 is a rapid curing material that allows highway, road and bridge approach/departure surfaces to be used within 15 minutes of a project's completion.
  • With 75,000 completed projects worldwide URETEK USA has the expertise to put you in control of your pavement lifting and soil stabilization problems.
Case Studies:
 
URETEK USA Delivers:
 
Time Savings:
90% faster than competitive solutions
Project work completed in hours/days versus weeks/months
Fast installation, curing and cleanup

Minimal Disruption:
Minimizes or eliminates work zone delays
Work often done during off peak night time hours
Crews dismantle and remove work zones as they finish daily

Cost Savings:
Up to 75% less than replacement cost
10 Year material guarantee

Predictable Results:
75,000 successful projects worldwide
Precision adjustment to 1/8"
Hydro- insensitive - displaces under pavement water

Safety
Clean, organized worksite
Professionally trained & certified employees
Environmentally safe, inert product